The group orchestrated the instalment of four large reels, and two smaller reels of fibre-optic cable for the distribution of electronic information.
The cables were delivered from Rotterdam to Turkiye, and once the project was complete, their empty reels were transported back to Rotterdam as a final operation.
This shipment was successful thanks to the due diligence of all teams involved.