The movement was critical because of the strict requirements stipulated by the Research Designs & Standards Organisation (RDSO) of Indian Railways which had to be implemented during the operations. The EXG engineering team coordinated to create a thorough plan, including organisation and preparation of an in-depth inspection at the site before the unloading of the cargo, to allow for the smooth execution of the project.
EXG followed all the safety and handling compliances and in order to ensure the highest standards, the lifting beams and rail clamps were fabricated well in advance to allow for the safe handling of the cargo and to avoid any damage. To mitigate any traffic delays and constraints when moving the cargo, they obtained the relevant permissions to execute the entire movement during the night.
EXG showed their strong commitment by speeding up the transport of these rails to meet the required timeframe of their clients.