The EXG team faced heavy non-seasonal rains and overcame unexpected road conditions due to the sudden change in weather. Civil work had to be done in several areas in Gujarat to ensure the safe movement of the over-dimensional cargo.
During the arduous journey, the height of the cargo also required the structure of a toll plaza be dismantled and rebuilt for the cargo to pass.
The cargo was safely delivered well within the time frame thanks to the professional team at EXG.